KIWISAVING Dual-Container Linked Industrial Expandable Home | 2×36㎡ Engineering-Grade Hybrid Space

Color

Wooden Panels & Black Structure & Black Windows

Product Dimensions

20×19×8.3ft / unit, 2 units total

Floor Area

760 Square Feet, 2 Units Combined

Layout Inside the modular home

Customized Bedrooms, Bathroom, Kitchen, Living room

Specification of The combined expandable house

·Layout Inside the tiny home: Customized Bedrooms, Bathroom, Kitchen, Living room

·Main Usage: Prefab Container House to live in for adults

·House Area: 760 sqft

·External Dimensions: L19 x W20 x H8.3 ft / unit, 2 units total

·Folded Dimensions: L19 x W7.3 x H8.3 ft / unit, 2 units total

·Weight: 15000 lb

features

1. Rigid-Flex Linkage Anti-Deformation Structure

Hinged load-bearing + elastic sealing dual joints enable “dynamic rigidity” for 2×36㎡ units. Withstands ±8cm mining subsidence & 1.2g construction vibrations. Structural deformation ≤0.3‰ (vs 2.1‰ welded). 97% integrity in seismic mines → 150% safety redundancy—outperforms generic containers in disasters.

2. 72㎡ Flexible Function Matrix System

Open space switches to “production → camping → shared hub”:heavy-duty partitions (1t/m² equipment racks) install in 2 hours. Production mode fits 8 mining machines/construction tools; camping mode expands to 6 beds + 3 baths (partitions with emergency storage). 92% asset reuse (vs 55% generic) → fits “day-night function flip” in industrial scenes.

3. Off-Grid Energy Self-Cycle Ecosystem

Roof-integrated 8kWp cadmium telluride flexible solar + 20kWh liquid-cooled storage (works in -20℃~60℃). 96-hour off-grid autonomy (continuous rain) → 85% lower energy cost in remote mines. Integrated lightning protection (Class Ⅰ) → 70% higher power survival in thunderstorm mines—creates “solar-storage-use-protect” cycle.

4. Industrial Scene Readiness Package

5mm anti-slip armor steel floors (impact strength ≥450J), ceiling with 3t heavy-duty slides (supports mining equipment transfer). Perfect for equipment storage/material turnover. Mining anti-corrosion camouflage coating (1500-hour salt spray test) → 82% lower rust rate in harsh mines. 100% plug-and-play compatibility (no extra retrofit).

5. All-Weather Rapid Deployment

Forklift direct linkage + Beidou calibration → 35 mins for main build (including energy/equipment). 70% faster than traditional split installation. Linkage error ≤1.5mm (Beidou cm-level positioning) → “hour-level” delivery for emergencies—sets “blitz” benchmark in industrial infrastructure.

Internal & external facilities details

notice info

Delivery to your door

Shipped by sea to your nearest NZ port, then trucked to your site. We’ll confirm a delivery window with you before dispatch.

Site & Foundation

We can help with foundation work if you need it. Our team can assess your site and get everything prepared before delivery arrives

Design & Consents

Our in-house architect can help with design, council consents, and compliance. Whether you need full support or just a hand with the paperwork, we’re happy to help.

Turnkey & Move-in Ready

From foundation to fit-out, utilities connected and ready to live in. One team, one point of contact. We take care of everything so you can just move in.